EU buyer asking for an EUDR dossier? Be ready before you ship.
LELOI helps Vietnamese exporters turn scattered documents, plot data, supplier records and shipment evidence into a structured dossier EU buyers can review.
The working portal interface is currently in Vietnamese. Forms are bilingual, and the videos below have English narration and captions.
EUDR dossiers for Vietnamese suppliers, in short videos
What EU buyers will ask for, and how a Vietnamese wood or coffee supplier builds a plot-level dossier step by step: geolocation, deforestation screening, lot traceability and a draft due diligence statement.
EUDR dossiers for Vietnamese suppliers — introduction to the LELOI GLOBAL portal
What the EU Deforestation Regulation (EUDR) requires, what EU buyers will ask for, and how Vietnamese wood and coffee suppliers can build a plot-level dossier: geolocation, deforestation screening, lot traceability and a draft due diligence statement.
Narration and captions are in English. The portal screens shown are in Vietnamese, as the working interface is currently Vietnamese only. All data in the videos is sample data.
EUDR made simple — you enter, we automate
No 300-page regulations, no GIS software, no consultants. Enter your data, click Next — LELOI turns it into a compliant, buyer-ready EUDR dossier automatically.
You just enter
Add suppliers, draw growing-area polygons, upload (or paste links to) your legality documents. Only what you already have.
The system does the hard part
Automatic geolocation, satellite deforestation screening (GFW / Copernicus), risk scoring and a DDS draft — no GIS or legal expertise needed.
Done — buyer-ready
Export a structured, buyer-ready dossier and share a secure Buyer Portal link your EU customer can review directly.
No card. No commitment. Add your first supplier in 2 minutes.
Built on real Vietnamese legality documents
Below are real documents from an actual export (personal data redacted). This is the exact document chain LELOI structures into a buyer-ready EUDR dossier.
FSC-certified partner mill
Chain-of-custody certificate
GFW & Copernicus
Real satellite deforestation screening
VNTLAS / FLEGT
Vietnam–EU timber legality framework

FSC certificate (partner mill)

Harvest design map (plot polygon)
Real forest plot boundary — the geolocation EUDR requires.

Forest product inventory (Bảng kê lâm sản)
Official species & volume record — legality of harvest.

Land-use right certificate (sổ đỏ)
Proof of legal land tenure for the growing area.

Purchase contract
Chain of custody from grower to exporter.
Start your EUDR declaration — free
Add suppliers, draw plot polygons, attach legality docs — build a buyer-ready dossier step by step. First 2 suppliers free, no card needed.
Start free declarationSample documents — personal data (names, ID numbers, land-book numbers) redacted for privacy. LELOI prepares & structures the dossier; the legal DDS is submitted by the EU operator/importer via the EU Information System (TRACES).
EU buyers also ask for REACH & PPWR
Same buyer, more requirements. We prepare the evidence packs — you declare once, cover EUDR, REACH and PPWR together.
REACH — Chemicals in products
Since 6 August 2026, wood panels and furniture sold in the EU must stay within the new formaldehyde emission limit (0.062 mg/m³), on top of restricted substances and SVHC. You need test reports + a Declaration of Compliance.
PPWR — Packaging
In force since 12 August 2026: heavy-metal limits for all packaging and a PFAS ban for food-contact packaging such as coffee bags. Sorting labels follow from 2028 and recyclability rules from 2030. You need a Packaging Declaration.
Document preparation & screening — not legal certification.
Why exporters worry about EUDR
Buyer is asking for the dossier
An EU buyer suddenly requests EUDR evidence and you have no structured file ready.
No geolocation / polygon
You don't have GPS coordinates or plot polygons (GeoJSON) for your growing areas.
What even is a DDS?
Due Diligence Statement, traceability, risk screening — unfamiliar requirements, tight deadline.
No batch-level traceability
You can't link a shipment back to the exact farms/plots it came from.
Fear of EU orders stalling
Without the right evidence, clearance can be delayed, blocked or questioned.
Explore EUDR with LELOI
EUDR questions, answered
Is there an EUDR certificate?+
No. The EU does not issue an EUDR certificate and has not authorised anyone to. EUDR (Regulation (EU) 2023/1115) creates an obligation: before relevant products enter the EU market, the EU operator must file a due diligence statement (DDS) in the EU Information System. Suppliers outside the EU contribute data and evidence, not a certificate.
Who submits the due diligence statement for goods from Vietnam?+
The EU operator, normally the importer or first placer on the market, submits the DDS and carries the legal responsibility. A Vietnamese supplier prepares the plot-level data, legality documents and lot traceability the operator needs. LELOI prepares that dossier and a draft DDS data package; it does not file on the operator's behalf.
Is Vietnam a high-risk country under EUDR?+
No. Vietnam is classified as low risk under Commission Implementing Regulation (EU) 2025/1093, so operators may apply simplified due diligence under Article 13. Geolocation, traceability and legality evidence are still required, because the risk classification does not remove the information obligations.
What geolocation data does EUDR require for coffee and wood?+
Geolocation of every plot of land where the commodity was produced: coordinates with at least six decimal places, and a polygon (not a single point) for plots larger than four hectares. For wood, the location is where the trees were felled. Wood and coffee are both in scope; sawn rubberwood and rubberwood furniture count as wood products.
What is the cut-off date for deforestation?+
31 December 2020. Products must come from land that was not deforested or degraded after that date, and must be produced legally under the laws of the country of production.
When does EUDR apply?+
30 Dec 2026 for large and medium operators. Micro and small enterprises have until 30 June 2027, except for wood products, which apply from 30 December 2026 regardless of size. Your EU buyer will usually ask for the data before the legal date.
How much does it cost to prepare an EUDR dossier with LELOI?+
The first two suppliers can be set up free in the portal, and the bilingual Vietnamese-English EUDR forms for coffee and for wood are free to download after sign-in. Paid plans and assisted preparation are quoted on request.
Is the LELOI EUDR portal available in English?+
The working interface is currently in Vietnamese. The forms are bilingual (Vietnamese and English), and the walkthrough videos on this page have English narration and captions over the Vietnamese screens. If your supplier works in Vietnamese, they can complete the dossier and share a read-only data-room link with your team.
Simple pricing — start free
First 2 suppliers are free. From the third, a plan applies.
Starter
your first few suppliers
- You enter the data yourself
- Satellite deforestation screening (GFW)
- Draft DDS + Buyer Portal link
Pro
mid-size operations
- Everything in Starter
- All modules + unlimited exports
- Priority support
Enterprise
unlimited suppliers
- Unlimited suppliers
- Highest-priority support
- White-label Buyer Portal
- EU filing package (TRACES)
Done for you
on request
- LELOI standardises the dossier
- Field GPS survey — quoted per location
Field GPS survey is quoted per location — LELOI connects a survey partner (we do not do fieldwork in-house). Most plots can be declared free using coordinates from your existing land certificate.
Don't wait for the buyer to ask
Start free — build your first 2 suppliers yourself, or let LELOI build them before the deadline.
LELOI helps prepare & screen EUDR dossiers — not a certification or legal advice. Final legal responsibility rests with the EU importer/operator.